Import Mappings¶
OEE → Configuration → Import Mappings
Your planning team probably already has a spreadsheet. It has its own column names, columns OEE doesn't need, and dates written your way. An import mapping tells Enture which of your columns holds each planner field. After that you can upload that spreadsheet to the Machine Production Planner as it is, without copying anything into our template.
You can keep several mappings, for example one for an ERP export and one for a customer's sheet. One of them is the default, and every upload is read with the default. To read a different kind of file, make its mapping the default first.
Creating, editing and deleting mappings is an engineer's job. Anyone who uploads plans can see which mapping is in use.
Creating a mapping¶
Click Add mapping (or +) and fill in:
| Field | What it does |
|---|---|
| Mapping name | A name you'll recognise, such as SAP export. Two mappings can't share a name |
| Use as default | Uploads are read with this mapping from now on. Your first mapping is always the default |
| Sample file | Drop in one of your own .csv or .xlsx files. Enture reads its column names to fill the lists below. Nothing from the file is saved except those names |
| Sheet | Only shown for a workbook with several sheets. The first sheet is selected to begin with |
| Header row | The row number that holds your column names. Row 1 is selected to begin with. Change it if your sheet has a title or notes above the table |
| Date format | How dates are written in your file, for example DD/MM/YYYY or DD-MMM-YY (01-NOV-26). Enture picks the format that fits your sample dates and shows how the first one reads, so you can check it. Month names can be in capitals or not, and a two-digit year such as 26 is read as 2026 |
Then, against each planner field on the left, pick the column from your file that holds it. A column you've picked disappears from the other lists, so one column can't be used for two fields by mistake. The first value under each column is shown beside it so you can check you've got the right one. Columns with obvious names such as Machine Code, SKU or Qty are matched for you; change any match that's wrong.
No sample file to hand? You can type each column name instead.
You can leave the page while a mapping is half done, for example to look up machine codes in another screen or tab. When you come back to Import Mappings in the same browser tab, the mapping opens again as you left it. It's only thrown away when you Save or Cancel.
| Planner field | Needed? |
|---|---|
| Machine code | Always. The machine's code, not its display name |
| SKU | Always. The product name, as spelled in your SKU list |
| Date | Always |
| Planned qty | Needed unless Calculate planned qty based on cycle time is on when you upload |
| Planned production time (mins) | Needed unless Calculate planned qty based on cycle time is on when you upload |
| UOM | Optional |
| Shift | Optional. See Files with no shift column |
| Planned downtime (mins) | Optional. Left blank, it counts as zero |
Leave a field on Not mapped if your file doesn't have it. Any column of yours that isn't mapped is ignored.
Dates stored as real Excel dates
If a date column in an .xlsx file holds real Excel dates rather than text, Enture reads them correctly whatever date format you chose. The format only matters for dates typed as text.
Files with no shift column¶
Many planning sheets give one figure per machine per day, not per shift. Leave Shift unmapped and Enture handles this for you. Each day's row becomes one plan per shift row of your organisation's mapped shift, and the day's figures are split by shift length.
For example, with three 8-hour shift rows, a day's row of 900 units and 60 minutes of planned downtime becomes three plans of 300 units and 20 minutes each. Split figures always add back up to the day's total. Whole numbers stay whole, so 100 units across three equal rows becomes 34, 33 and 33.
With Calculate planned qty based on cycle time switched on, the quantity and production time are worked out for each shift row from its own length instead of being split. Downtime is still split by length.
In the upload preview, split values are shown in the accent colour, and a line above the table says how many day rows were split into how many shift plans.
If your file does have a shift column, each value can be either the shift row's start time (06:00) or its name (Shift A).
Changing the default¶
Choose Make default on the mapping you want (it's in the ⋮ menu where a mapping has one). Every upload from then on reads files with that mapping.
Editing and deleting¶
Edit reopens the mapping. Drop a fresh sample file in to pick from its columns again. A mapped column that isn't in the new file is marked Not in this file.
Delete removes a mapping. Plans already uploaded with it are not affected. You can't delete the default while other mappings exist: make another one the default first, so uploads never switch to a mapping nobody chose.
Uploading a file with your mapping¶
On the Machine Production Planner, open New Plan and switch to CSV Upload. A line above the drop area names the mapping your file will be read with, with a link back to this page. Drop in your .csv or .xlsx file and the preview and checks work exactly as they do for the template.
If a mapped column or the mapping's sheet is missing from the file, the upload stops and names what's missing. Check the file, or edit the mapping.
Only .csv and .xlsx
The old Excel 97–2003 format (.xls) isn't supported. Save the file as .xlsx or .csv first.