3D Digital Twin¶
The 3D Digital Twin shows your site in 3D: its buildings, the floors inside them, outdoor areas such as a sewage treatment plant or a substation, and the equipment on each — with the live status of every machine.
Navigate to Digital Twin → 3D Twin.
Use it to:
- See at a glance which machines are running, idling, offline or in alarm — across the whole site, a building, or one floor.
- Find a machine where it physically stands, and jump from there to its details.
- Give people who don't know the plant model a picture of the site they recognise.
How it is organised¶
| Level | What you see |
|---|---|
| Site | The ground with every building, outdoor area and outdoor or rooftop piece of equipment |
| Building | The building opened up, with its floors listed |
| Floor | One floor of a building on its own, with its equipment and zones |
An organisation has one main site. Engineers can add further locations — a remote solar farm or a pumping station, for example — each with its own layout. When there is more than one, pick it from the site selector at the top of the page.
Enabling the 3D Digital Twin¶
The 3D Digital Twin is an add-on. Until it is enabled for your organisation, users see "The 3D Digital Twin isn't enabled".
Engineering access required
Enabling, disabling and building the layout need engineering access with Engineering Mode switched on. Everyone with Digital Twin access can view the layout once it is enabled.
- Switch on Engineering Mode.
- Open Digital Twin → 3D Twin.
- Build the layout (see Building the site). Until the add-on is enabled, the layout is a draft that only engineers can see.
- Click Enable 3D Digital Twin and confirm. This adds the 3D Digital Twin to your organisation's licence, and everyone with Digital Twin access sees the layout.
To turn it off, click Disable at the top of the page. Users no longer see the 3D view, but the layout is kept — enabling it again brings it back exactly as it was.
Equipment that is not linked to a machine¶
Every piece of equipment in the twin is either linked to a machine in Enture, or not linked yet:
- Linked equipment shows the machine's name and live status, and opens the machine's details.
- Not linked equipment is drawn normally but has no status light and isn't counted in the status totals. Its card says "Not linked to a machine".
Equipment placed in the editor starts as not linked, so you can lay out the site before every machine is set up in Enture. Link it later in the editor (see Linking equipment to machines), or place a machine straight from the editor's list of machines not in the twin yet.
Some equipment is often not a machine at all — transmission towers, overhead lines and storage racks. When these are not linked, their card doesn't say "Not linked to a machine" and the setup checklist doesn't count them. You can still link one if it has a machine in Enture, for example a line with its own feeder meter.
If a machine is deleted from Enture, its equipment stays in the twin, now not linked, under the machine's name.
Where to go next¶
- Viewing the twin — the site, buildings, floors and live status
- Getting around in 3D — mouse, touchpad and keyboard controls
- Building the site — starting a layout, buildings, floors, outdoor areas (engineering)
- Editing a floor — placing and arranging equipment on a floor (engineering)